• facebook
  • youtube
  • linkedin
Leave Your Message
Toys Universal Testing Machine Rattle Test Template - Oval (Template A) T046A
Toys Testing Instrument

Toys Universal Testing Machine Rattle Test Template - Oval (Template A) T046A

To determine whether rattles for infants of up to 18 months old present choking or suffocating hazards. The rattle is placed in the opening of test fixture. If any part of the rattle can pass through the opening without being pushed or pulled, the rattle has failed. For other rattles incorporating nearly spherical, hemispherical or circular flared ends, a Supplemental Rattle Test Fixture is available.

    Overview

    To determine whether rattles for infants of up to 18 months old present choking or suffocating hazards. The rattle is placed in the opening of test fixture. If any part of the rattle can pass through the opening without being pushed or pulled, the rattle has failed. For other rattles incorporating nearly spherical, hemispherical or circular flared ends, a Supplemental Rattle Test Fixture is available.

    Application

    企业微信截图_17665665738865

    Rattle

    企业微信截图_17665665594963

    Rattle

    Standards

    EN 71-1 section 8.16; ASTM F963 section 4.22.1, 4.23, 4.24
    ISO 8124-1section 5.3; GB 6675-2 section 5.3; 16 CFR 1510

    Key Parameters

    Standard accessories

    English manual

    Certificate of quality

    Product Details

    T046 - 副本 (4) - 副本

    Orifice

    T046 - 副本 (3) - 副本

    Flat

    Production Processes

    图片1

    Process design and design and manufacture of specialized process equipment

    image0316kf

    Machining of components

    Assembly of products

    Assembly of products

    image0267we

    Comprehensive testing of machines

    Scenarios of Use

    image030cct

    Laboratory

    image027i5g

    Textile factory

    Operation

    1

    Connecting the air supply

    Connect the air supply to the instrument.
    2

    Add distilled water

    Connect tube from the freestanding funnel to the water connector located at the back right-hand corner of the SST unit. Add distilled water.
    3

    Put in filte

    Unscrew the screws and remove the top plate,Take away the reflector.
    Put in filter.
    4

    Install the xenon lamp

    Install the xenon lamp and connect the lamp cabler.Replace the top cover and tighten the set screws.
    5

    Mount the sample

    Mount the sample on the sample clamp.
    6

    BPT Sampling

    Place the sample into the test chamber and close the door.Be careful to avoid covering the BPT sensor.

    Transportation

    image071evh

    Packing System

    1. Products are covered with air bubble film before put them into composite board standard export wooden case. To ensure waterproof, moistureproof, corrosion, anti-corrosion and security.
    2. Package with shipping mark in line with International and national standards, which is easy for handling, loading and unloading.
    3. Packing materials selected accorded with economic and safety requirements
    4. Compliance with environmental requirements.

    For Metal Box Package

    image07470y
    image075gi2
    图片1

    For Carton Package

    image078n3e
    image07703l
    image079bsv

    For Wooden Case

    image081602
    image082szo
    image0800r6